ACCA考試08年6月P1試題答案(6)

來(lái)源: 正保會(huì)計(jì)網(wǎng)校論壇 編輯: 2010/08/11 10:33:42  字體:

選課中心

多樣班次滿足需求

選課中心

資料專區(qū)

干貨資料助力備考

資料專區(qū)

報(bào)考指南

報(bào)考條件一鍵了解

報(bào)考指南

  (e) Control and sub-contractors

  Specifically in regard to the maintenance of internal controls when working with sub-contractors,the prominent difficulties are likely to be in the following areas:

  Configuring and co-ordinating the many activities of sub-contractors so as to keep progress on track. This may involve taking the different cultures of sub-contractor organisations into account.

  Loss of direct control over activities as tasks are performed by people outside R&M’s direct employment and hence its management structure.

  Monitoring the quality of work produced by the sub-contractors. Monitoring costs will be incurred and any quality problems will be potentially costly.

  Budget ‘creep’ and cost control. Keeping control of budgets can be a problem in any large civil engineering project (such the construction of the new Wembley Stadium in the UK)and problems are likely to be made worse when the principal contractor does not have direct control over all activities.

  Time limit over-runs. Many projects(again such as the new Wembley Stadium,but others also)over-run significantly on time.

  Tutorial note:only four difficulties need to be described.

[上一頁(yè)]                  [下一頁(yè)]

我要糾錯(cuò)】 責(zé)任編輯:肖肖
學(xué)員討論(0

免費(fèi)試聽

限時(shí)免費(fèi)資料

  • 近10年A考匯總

    歷年樣卷

  • 最新官方考試大綱

    考試大綱

  • 各科目專業(yè)詞匯表

    詞匯表

  • ACCA考試報(bào)考指南

    報(bào)考指南

  • ACCA考官文章分享

    考官文章

  • 往年考前串講直播

    思維導(dǎo)圖

回到頂部
折疊
網(wǎng)站地圖

Copyright © 2000 - m.odtgfuq.cn All Rights Reserved. 北京正保會(huì)計(jì)科技有限公司 版權(quán)所有

京B2-20200959 京ICP備20012371號(hào)-7 出版物經(jīng)營(yíng)許可證 京公網(wǎng)安備 11010802044457號(hào)